Chimmels, Park Rd, Dartington Hall, Totnes TQ9 6EQ

First Quantum Minerals Limited (FQML)
Evolving a global HR integration platform through hybrid BizTalk and Azure services
The Challenge
First Quantum Minerals Limited (FQML) is a global metals and mining company operating across multiple continents, with a geographically distributed portfolio of mining operations. Founded in 1996 in Zambia, the company operates mines across four continents, producing copper, gold, and zinc. Alongside its commercial operations, FQML supports initiatives that benefit local communities, including employment, housing, conservation, and water sustainability.
To manage employee data across this environment, FQML needed to integrate its HR systems with a range of business-critical platforms, including Active Directory, payroll, access control, and training systems.
The organisation had an existing BizTalk-based integration solution, originally implemented to connect its HR system (Lumesse) with its wider IT estate. After several years of successful use, the platform needed to be upgraded and restructured to support future growth, alongside the introduction of Workday as the new HR system.
The Approach
We have worked with FQML over a number of years, initially designing and delivering a BizTalk-based HR integration solution, and later supporting its evolution as requirements changed.
The original solution was intentionally delivered in a lean, cost-effective way, using a single BizTalk 2010 Standard application to demonstrate capability and provide immediate value.
As requirements evolved, we were re-engaged to upgrade and expand the platform. This included migrating to BizTalk 2016 Enterprise and supporting the integration of Workday into the existing landscape.
Before development began on BizTalk 2016, we established a structured software development lifecycle (SDLC), ensuring integrations could be delivered in a consistent, quality-controlled environment with proper release management and version control.
To support this evolution, we:
This approach ensured that the platform could evolve in a controlled way, while supporting both existing and future integration requirements.
Our solutions
We delivered an upgraded and extended integration platform, built on BizTalk Server 2016 Enterprise, to support evolving business and system requirements.
Key elements included:
The Process
We began by building out the BizTalk 2016 environment and migrating the existing BizTalk 2010 solution into it, separating the original monolithic application into individual system-based integrations.
Once the new platform was in place, we worked with FQML to capture the design requirements for integrating the new HR system, Workday.
The software development environments were then scoped and established to support CI/CD delivery, enabling integrations to be developed and deployed in a consistent, controlled way.
The Workday interface was then added to the existing solution with minimal impact. This was made possible by the use of a canonical data model within the original BizTalk architecture, allowing the new integration to be introduced efficiently while maintaining compatibility with existing systems.
We continue to support the live platform and assist with the design and development of new interfaces, including proactive monitoring through BizTalk360, as well as installation, configuration and training support.
The Outcome
FQML now operates a flexible, scalable integration platform capable of supporting global HR processes and evolving system requirements.
Why it worked
By combining long-term partnership with a structured, incremental approach, we enabled FQML to evolve its integration platform in line with changing business needs, while maintaining stability across a global operational environment.